The kitchen has been completely gutted down to the studs, allowing for a fresh start in the renovation process. We have upgraded the electrical wiring to meet current safety standards and accommodate modern appliances. The plumbing system has also been replaced to ensure optimal functionality. Additionally, new insulation has been installed to improve energy efficiency, and drywall has been added to create a solid foundation for the new kitchen design. These extensive updates lay the groundwork for a beautiful and efficient space.
**Rough Phase:** Installation of new branch circuits, junction boxes, and temporary lighting systems throughout the dwelling. The work has been thoroughly inspected and has passed all necessary safety and compliance evaluations, ensuring that everything is up to code and ready for the next stages of development.
**Rough Phase: Installation of New Branch Circuits, Junction Boxes, Temporary Receptacles, and Lighting Fixtures**
During this phase, we will focus on the installation of new branch circuits for each load in the dwelling to ensure that there is adequate power supply throughout the dwelling. These circuits will connect to the main electrical panel and provide power to various locations as designed.
Additionally, junction boxes will be installed to safely manage electrical connections and splice wires. These junction boxes play a crucial role in protecting connections from environmental factors and reducing the risk of electrical hazards.
Temporary receptacles will also be set up at strategic locations to facilitate construction activities and provide power for tools and equipment. These receptacles will ensure that workers have access to electricity while the permanent wiring is being completed.
Moreover, temporary lighting fixtures will be installed to provide adequate illumination for the worksite. This is essential for safety and efficiency, ensuring that all areas are well-lit during the construction process.
Overall, this rough phase is critical for laying the groundwork for the electrical system, paving the way for future installations and ensuring that all components meet safety standards.